Answer
Can I buy windows supply-only and get a builder to fit them?
Short answer
Yes, but splitting supply and fitting can split responsibility when something goes wrong. Agree who surveys, checks the order, handles delivery, installs to the maker's instructions and arranges compliance paperwork. A lower supply price is not the whole project cost. This route suits a coordinated build better than an unclear handover between companies.
Planning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Yes — but understand where responsibility splits
You can buy windows supply-only and have your builder fit them, and on extensions or self-builds it often works smoothly because the builder already has scaffolding up and visiting site. On a straightforward replacement job, however, splitting supply and fitting means that if a door leaks or binds six months later, the supplier can point to fitting tolerances while the builder blames fabrication.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building controlWho owns the survey measurement?
On a supply-only order, the manufacturer builds strictly to the signed dimensions you or your builder submit. If a frame arrives 20 mm too tall because finished floor build-up or height was misread, the remake cost sits with whoever signed off the schedule — not the factory. Have the builder physically sign the manufacturing drawings after openings are formed or measured.
cill
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillHow compliance sign-off changes
A general builder is rarely registered with a replacement-glazing self-certification scheme. On an extension or new build in England, signs off the glazing as part of the wider inspection; on replacement windows without an active building-control application, you will need a separate building-control notice and fee. In Scotland, check whether your work falls under an existing building warrant or requires one.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control| Responsibility | Single supply-and-fit company | Supply-only + builder |
|---|---|---|
| Final survey sizes | Installer carries measuring risk | Builder or homeowner carries measuring risk |
| Delivery & glass handling | Installer unloads, inspects and stores frames | Builder checks delivery on arrival; damage must be logged immediately |
| Aftercare if a door binds | One company responsible for product and adjustment | Supplier covers manufacturing faults only; builder covers fitting |
| Building regs sign-off | Usually handled via scheme or building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control | Covered under extension building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control |
What to check
- Allocate survey, order approval and delivery inspection
- Check the fitter's experience with that system
- Agree product warranty, installation cover and compliance route
Print this page to use the checklist on the day.
Official information
Related pages on this topic
Questions people also ask
Can the supplier blame the fitter?
Separate contracts can create a dispute about cause. Written responsibilities and inspection records help.
Does supply-only include a fitting guarantee?
Not ordinarily as part of supply alone. Ask the fitter for their own written installation cover.
Can any builder self-certify replacement windows?
No. Check the applicable registration or arrange ; do not assume a building business is a registered window installer.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building controlLast reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.