Planning windows and doors for an extension
Free guidance. No fees. No sales calls.
Short answer
Decide on the glazed doors early, ideally before the structural drawings are final, because the opening size, steel and all depend on them. Then choose the system, agree the and drainage detail, get a proper survey once the opening is built, and allow for lead times.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdthreshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdPlanning this? Get a free, no-obligation installer recommendation
Plan extension glazing before your structural engineer sizes the steel beam or your builder pours the floor slab: choosing between sliding doors, bifolds or fixed screens sets the opening width, steel deflection limit, recess and external drainage run.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdThe order that works
- At design stage: choose between sliding, bifold or fixed glazing so the architect sizes the opening
- Before structural drawings are final: tell the engineer the door type, so the steel is designed for it
- Before the floor goes in: agree the height and drainage outside
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold - Once the opening is built: a full survey and signed-off drawings
- Order: allow for lead times so the doors arrive when the build is ready
Read next
Questions people also ask
When should I get a quote for the doors?
Get a budget price at design stage, and a firm quote once the drawings are fixed.
Last reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy