Planning windows and doors for a new build or self-build

Short answer

On a new build, decide the glazing with the layout and energy design before fixing the openings. Then coordinate structural support, ventilation, shading and wall junctions, compare a complete schedule, and agree who authorises manufacture. Order against an agreed programme and release dimensions, then inspect the installation and collect the completion evidence before final payment.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
This is the sequence for decisions and hand-offs, not a substitute for the full self-build buying guide. A designer, energy assessor, builder and glazing supplier need one current schedule. Record who owns each decision: a budget quote should not silently become permission to manufacture, and the frame junction must match the actual wall build-up.

1. At concept stage: settle the room and energy brief

Mark views, furniture, openings and orientation on the plan. Ask the energy assessor and designer to consider glazing area, ventilation and summer comfort together. Choose opening actions early enough that escape needs and safe cleaning are designed rather than patched into a finished elevation.

2. Before detailed design is frozen: coordinate the junctions

Send the intended system sections to the designer and structural engineer. Agree supports, movement allowances, finished floor levels and how the window connects to the insulation and weather layers. Timber-frame and masonry junctions are not interchangeable. Record who provides each bracket, membrane and finishing detail.

3. Before placing an order: compare a complete schedule

Issue one schedule of dimensions, opening directions, glass, finishes and hardware. Ask tenderers to show deviations rather than replacing your specification quietly. Agree payment milestones, manufacturing release, delivery access and storage. Use the quote checker before committing and confirm the approval route with the project team.

4. Before manufacture and delivery: release information deliberately

The builder, designer and supplier should agree the measurement or approved-drawing basis and who signs it. Confirm the opening readiness date and lifting plan before accepting delivery. Coordinate inspection stages and any work that must be visible before junctions are covered. Do not use a generic lead time as a promise for your programme.

5. At installation and handover: check and keep the evidence

Inspect operation, drainage, seals and agreed making good while access remains available. Resolve outstanding items in writing and record responsibility for return visits. Keep the final drawings, product declarations, care instructions, guarantees and applicable completion documents together. Show all household users the locks, ventilation and safety settings.

Questions to ask before you commit

  • Who signs the energy and overheating design before glazing is fixed?
  • Who owns dimensions and authorises manufacture?
  • How do the frames join the actual wall insulation and weather layers?
  • Can the largest pane reach the opening and later be replaced?

Print this page to use the checklist on the day.

Paperwork to keep from design to completion

  • Current opening schedule and coordinated elevations
  • Structural and wall-junction details approved by the project team
  • Energy and ventilation design records for the proposed configuration
  • Applicable planning approval and building-control or Scottish warrant records
  • Signed order, manufacturing release and agreed delivery plan
  • Final product, care, guarantee and completion documents

Print this page to use the checklist on the day.

Official guidance: confirm your approval route

Read at the right decision point

Tools for the decisions ahead

What to do next

Related pages on this topic

Questions people also ask

Should I order from the first drawings?
Use them for budget pricing. Manufacture needs an explicitly agreed dimension basis and release process, not an assumption that early drawings are final.
Is a replacement-window certificate enough for a new build?
Do not assume it is. Agree the new-build approval and completion route with the designer and relevant authority.
Who coordinates the installer and builder?
Name that responsibility in the contract and programme, particularly for membranes, brackets, floor levels and inspections.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.