
Guide
How to choose a window and door installer
Free guidance. No fees. No sales calls.
Short answer
Choose a window and door installer by checking their insurance, technical survey process, written specification and guarantees before you commit. Compare at least three itemised quotes line by line, walk away from same-day discount pressure or cash-only offers, and know your rights under the Consumer Contracts Regulations 2013 and Consumer Rights Act 2015.
Planning this? Get a free, no-obligation installer recommendation
Free printable PDF: How to choose a window and door installer
Includes all 7 sections, the 15 questions to ask, red flags, your legal rights and a full-page printable 3-quote comparison table.
Key facts at a glance
| Fact | UK guide figure or rule | Source & checked |
|---|---|---|
| Employer's liability insurance | By law, UK businesses that employ staff must hold Employer's Liability insurance (minimum £5 million cover) against injury or illness arising from employment, under the Employers' Liability (Compulsory Insurance) Act 1969 and 1998 Regulations. | legislation.gov.uk (SI 1998/2573) & HSEChecked 24 November 2026 |
| Public liability & goods-in-transit | Public liability insurance covers accidental damage to your home, neighbours' property or injury during installation. Ask to see a current policy certificate and check goods-in-transit cover for bespoke glass and frames. | HSE Employers' Liability GuideChecked 24 November 2026 |
| 14-day cancellation right | Off-premises contracts signed at home carry a 14-day cancellation right under the Consumer Contracts Regulations 2013 (Regs 29–30) — except Regulation 28(1)(b) excludes goods made to the consumer's specifications (bespoke made-to-measure windows and doors). Read the contract trigger before signing. | legislation.gov.uk (SI 2013/3134)Checked 24 November 2026 |
| Statutory quality & care | Under the Consumer Rights Act 2015, goods must be of satisfactory quality (s.9), fit for purpose (s.10) and as described (s.11); installation services must be carried out with reasonable care and skill (s.49). | legislation.gov.uk (2015 c. 15)Checked 24 November 2026 |
| Claim time limits | Breach-of-contract claims for faulty goods or installation are subject to a 6-year limitation period in England, Wales and Northern Ireland, and 5 years in Scotland. | Consumer Rights Act 2015 Explanatory NotesChecked 24 November 2026 |
1. Check their insurance
Window and door installation involves heavy glass units, power tools, ladders or scaffolding, and work directly on the structure of your home. Before you let anyone start work — or even before you shortlist them — ask to see proof of their current insurance policies. A reputable installer will send copies without hesitation.
Public liability insurance
What it is: Insurance that covers accidental damage to your property, a neighbour's property, or injury to a member of the public caused by the installer's work. Why it matters: If a heavy glazed door slips onto a tiled floor, a ladder damages a parked car, or debris cracks brickwork, public liability cover ensures you are not left chasing an uninsured trader for the repair cost. What to ask to see: A current policy schedule or certificate showing the exact trading or legal company name, the indemnity limit (commonly £2 million or £5 million for domestic glazing), and the policy expiry date.
Employer's liability insurance (where they employ staff)
What it is: Compulsory insurance covering claims if an employee is injured or becomes ill as a result of working for the business. Under the Employers' Liability (Compulsory Insurance) Act 1969 and The Employers' Liability (Compulsory Insurance) Regulations 1998 (legislation.gov.uk and HSE guide HSE40, checked 24 November 2026), almost every UK business that employs staff is legally required to hold employer's liability cover of at least £5 million. Why it matters: If a fitter is injured on your property while working for an employing company, proper cover protects both the worker and the continuity of the business completing your job. What to ask to see: Their current Employer's Liability certificate (or confirmation if they are a sole trader with no employees; if they use subcontractors, ask how those fitters are insured).
Product and goods-in-transit cover (where relevant)
What it is: Goods-in-transit cover protects bespoke frames and sealed glass units while they are being transported from the factory or depot and unloaded at your home; product liability cover covers injury or damage caused by a defective product supplied by the business. Why it matters: Oversized sliding-door panes, roof lanterns and bespoke painted frames can cost thousands to remake if damaged in transit. What to ask to see: Ask the installer to confirm in writing that the windows and doors remain their responsibility — and insured — until they are safely delivered and installed at your property.
2. What a proper survey includes
A sales visit gives you a budget price; a technical survey measures the building so the factory can manufacture to the millimetre. Never let an installer order bespoke frames off rough tape-measure guesses from a quick sales quote. See our full survey checklist for the complete day-of-survey list.
- Brick-to-brick and reveal measurements checked in multiple places for width, height, diagonals (squareness) and plumb.
- Structural check above the opening — confirming whether a proper exists (older timber windows sometimes carried masonry weight above them, especially in period homes and bays).
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintel - Cill projection, threshold height and external drainage — especially critical on bifolds, sliding doors and front doors so water clears the wall and internal floors clear the frame.
- Opening directions, handle positions and clash checks against kitchen taps, radiators, curtains, blinds, garden furniture and external paths.
- Ventilation, safety glass and escape checks — confirming , toughened or
trickle vents
trickle vent: A trickle vent is a small controllable opening intended to provide background ventilation through or near a window frame. It is different from opening the sash and does not replace extraction where that is needed. Whether vents are required depends on the building, ventilation strategy and applicable rules, not appearance alone. More on trickle ventin low-level or door zones, and wide-opening egress hinges where needed.laminated glass
laminated glass: Laminated glass has glass layers bonded around an interlayer that can hold broken pieces together. Depending on its specification, it may serve safety, security or acoustic purposes. Those functions are not automatic: the glass build-up, supporting frame and tested application decide what protection the complete assembly can provide. More on laminated glass - Signed manufacturing drawings or specification sheet showing every opening elevation, glass type, colour inside/out, hardware finish and any plastering or trim work agreed before manufacture begins.
3. Quote comparison checklist (printable 3-quote table)
Quotes for the same house often vary by thousands of pounds because one company has priced a complete specification and another has left out making good, upgraded glass or scaffolding. Print this table (or use the downloadable PDF above) and fill in all three columns side by side before choosing. You can also upload any quote to our free quote checker for a written review.
| Item to check | What the quote should state | Quote 1 | Quote 2 | Quote 3 |
|---|---|---|---|---|
| Product system | Exact brand, profile system and material (not just 'premium aluminium' or 'A-rated uPVC'). | |||
| Glass specification | Double or triple, thickness, low-E coatinglow-E coating: A low-E coating is a thin, low-emissivity layer on glass that reduces the transfer of heat by radiation. It helps insulating glazing retain warmth. It is not automatically solar-control glass, and the complete specification still needs to address light, summer heat, safety and the performance of the sealed unit. More on low-E coatingwarm-edge spacerwarm edge spacer: A warm edge spacer separates the panes around the edge of an insulating glass unit while reducing heat conduction compared with a conventional aluminium spacer. It forms part of the sealed edge assembly. It can improve edge temperatures, but it does not remove the need for sound seals and room ventilation. More on warm edge spacer | |||
Whole-window / door U-valueU-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value | Whole-unit U-valueU-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valueWERWindow Energy Rating: A Window Energy Rating is a label assessing a window as a complete product, taking account of heat loss, solar gain and air leakage. It is not the same measurement as a glass U-value. Compare labels for the proposed window configuration and consider the room orientation alongside the rating. More on Window Energy Rating | |||
| Security standard | PAS 24PAS 24: PAS 24 is a security test specification for complete windows and external door sets. It examines resistance to defined attack methods rather than promising that a product cannot be broken into. Evidence should relate to the actual system, configuration and hardware, not merely a lock or a broad product range. More on PAS 24Secured by DesignSecured by Design: Secured by Design is a police security initiative that includes an approval scheme for products such as windows and doors. It is not a general guarantee against crime. Check the current listing for the proposed product and distinguish product approval from wider recommendations about the design of a building. More on Secured by Designmultipoint lockmultipoint lock: A multipoint lock secures a door at several positions along the edge, using a linked mechanism operated by the handle or key. It can help engagement with the frame but does not guarantee security on its own. Cylinders, keeps, hinges, glazing and the tested door assembly all matter together. More on multipoint lock | |||
| Hardware | Handle style and colour, hinge type (egress, easy-clean, heavy-duty), restrictors and trickle venttrickle vent: A trickle vent is a small controllable opening intended to provide background ventilation through or near a window frame. It is different from opening the sash and does not replace extraction where that is needed. Whether vents are required depends on the building, ventilation strategy and applicable rules, not appearance alone. More on trickle vent | |||
| Colours & finishes | Exact RALRAL: RAL is a colour reference system used to specify finishes, including many coated aluminium windows and doors. A reference identifies a colour target, not a guarantee that different materials or finishes will look identical. Surface texture, gloss, lighting and the coating process can alter how the chosen shade appears. More on RALfoilfoil (woodgrain): A woodgrain foil is a decorative surface layer bonded to a profile, commonly used on uPVC windows and doors to imitate painted or stained timber. It describes the finish, not the frame material. Texture, colour, corner joints and matching trims all affect how convincing the result looks on a real building. More on foil (woodgrain)dual-colourdual colour: Dual colour means that a window or door has different finishes on its outside and inside faces. It may be achieved through coatings, foils or separate components, depending on the material and system. Check what is visible at edges and when the sash or door is open, not only when closed. More on dual colour | |||
| Removal & disposal | Stripping out old frames and glass, responsible licensed disposal, and clearing all rubble and packaging. | |||
| Making good | What happens to internal plaster revealsreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal | |||
| Guarantees | Ask what product and workmanship guarantees are included, and for how long. | |||
| Lead time & start trigger | Estimated weeks from a clear trigger (e.g. signed survey sign-off), not a vague promise from enquiry. | |||
| Payment stages | Clear schedule of staged payments (if any) and confirmation that the final balance is due only on satisfactory completion. |
4. 15 questions to ask every installer
Send these 15 questions by email so the answers come back in writing. A good installer will answer every one of them plainly without hesitation.
Put these 15 questions to every company on your shortlist
- 1. What is your full legal business name and trading address, and can you send copies of your current public liability and employer's liability insurance certificates?
- 2. Are the windows and doors insured under goods-in-transit cover until they are delivered and fitted at my home?
- 3. Which exact window or door system and fabricator are you quoting, and can I see a full-size sample or corner section?
- 4. What is the whole-window or whole-door for the exact glass and sizes in my quote?
U-value
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value - 5. What security locks, hinges and glass specification (such as toughened or laminated panes) are included for each opening?
- 6. Are your fitters directly employed or subcontractors, and who is responsible for supervising the job on site?
- 7. Will a dedicated technical surveyor measure every opening after I order, and will I receive elevation drawings to approve before manufacture?
- 8. Does the quote include removing and responsibly disposing of all old frames, glass and packaging?
- 9. Exactly what making good is included inside and out — plaster , trims,
reveals
reveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal, mortar and silicone — and what is excluded?cills
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill - 10. Do you check for existing above openings, and how are any unexpected structural findings priced and agreed?
lintels
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintel - 11. Is scaffolding, a tower or specialist glass-lifting equipment needed for upper floors or large doors, and is it included in the price?
- 12. What product and workmanship guarantees are included, for how long, and are frames, sealed glass units, hardware and finishes covered separately?
- 13. What event starts the lead-time clock, and how do you communicate delays?
- 14. What are the payment stages, and is the final balance due only once all items are fitted, adjusted, cleaned and snags are agreed?
- 15. If a sealed unit mists up or a door drops out of alignment after fitting, who comes out to put it right and what is your written complaints process?
Print this page to use the checklist on the day.
5. Red flags to walk away from
A single omission on a first quote can be an honest oversight — ask for a revised written quote and judge how they respond. Walk away if you see these patterns:
- Pressure selling and "today only" pricing: genuine trade quotes are priced off fabricator costs and survey sizes, not artificial midnight deadlines or "call my manager" discounts.
- No written quote: if someone will only give a verbal price, refuses to leave an itemised quote, or insists both homeowners must sit through a long sales pitch, decline.
- Cash-only or "no VAT" offers: without a proper written contract and invoice, you have weak proof of what was agreed and little protection if anything goes wrong later.
- Refusing to show insurance: any business working on your home should be willing to share current public liability (and, where they employ staff, employer's liability) certificates before work begins.
- Vague specifications: quotes that only say "aluminium bifolds" or "A-rated windows" with no system name, glass build-up, or hardware detail.
U-value
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value - Pressuring you to waive cancellation rights or skip the survey: never sign away rights you have not read, and never approve manufacture without measured dimensions.
6. Your legal rights and what to do if things go wrong
General consumer information, not legal advice. Laws differ in some details between England, Wales, Scotland and Northern Ireland. If you are in an active dispute, contact Citizens Advice or a qualified legal adviser.
14-day cancellation right for contracts signed at home (Consumer Contracts Regulations 2013)
Under Part 3 (Regulations 27–30) of the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 (legislation.gov.uk, checked 24 November 2026), if you sign a contract away from the trader's business premises (for example at your kitchen table) or at a distance, you normally have 14 days to cancel without giving a reason.
The critical glazing exception — bespoke goods: Regulation 28(1)(b) (legislation.gov.uk, checked 24 November 2026) excludes the statutory 14-day cancellation right for goods made to the consumer's specifications or clearly personalised — which covers almost all made-to-measure windows and doors once ordered to your survey sizes. Check the contract carefully: many reputable installers still give you a cooling-off period up until the technical survey is signed off and manufacturing starts, but that must be written in the contract.
Goods and installation standards (Consumer Rights Act 2015)
Under the Consumer Rights Act 2015 (legislation.gov.uk, checked 24 November 2026), the windows and doors supplied must be of satisfactory quality (Section 9), fit for purpose (Section 10) and as described (Section 11). Under Part 1, Chapter 4 (Section 49), the installation service itself must be carried out with reasonable care and skill, and within a reasonable time if no date was fixed. If the goods or fitting breach these standards, you are entitled to remedies such as repair/re-performance or a price reduction. Explanatory Notes to the Act (legislation.gov.uk, checked 24 November 2026) confirm that breach-of-contract claims carry a 6-year limitation period in England, Wales and Northern Ireland, and 5 years in Scotland.
What to do if things go wrong
- Step 1 — Use the installer's complaints process first: write to the installer with clear photographs, opening numbers, dates and what you want put right, giving a reasonable deadline (typically 14 days) to respond and agree a visit. Ask for their written complaints policy and keep all replies in writing.
- Step 2 — Escalate to an ADR body or ombudsman: if you cannot resolve the issue directly with the installer, check whether they belong to an approved Alternative Dispute Resolution (ADR) service or ombudsman (such as the Furniture & Home Improvement Ombudsman or another approved consumer ADR provider). Traders must tell you if they are required or willing to use an ADR provider when a complaint reaches deadlock.
- Step 3 — Rely on your statutory consumer rights: your rights under the Consumer Rights Act 2015 (satisfactory quality, fit for purpose, as described, and installation with reasonable care and skill) and the Consumer Contracts Regulations 2013 apply regardless of any installer guarantee. For free next-step guidance on enforcing your rights, contact Citizens Advice or Trading Standards.
7. What to expect on fitting day and sign-off paperwork to keep
Before the fitters unload, walk the house together and confirm every opening, colour and glass specification against your signed survey sheet. Dust sheets should cover floors and furniture, old frames should come out without tearing away avoidable plaster, and every new frame should be mechanically fixed, packed properly (especially under hinges, locks and heavy door rollers), insulated around the perimeter gap and sealed neatly outside. See our installation-day checklist for a room-by-room check.
Paperwork to keep in your house file
- Your original itemised written quote and any agreed written variations
- Signed contract and signed technical survey drawings / opening schedule
- Paid final invoice showing the full business name, address and date of completion
- Written product and workmanship guarantee documents (stating exact durations for frames, glass units, hardware and finishes)
- Care, maintenance and lock/hinge adjustment instructions (plus all spare keys)
Print this page to use the checklist on the day.
How it is surveyed and fitted: step by step
Shortlist installers and check their insurance
Shortlist three installers and ask to see current public liability insurance, employer's liability insurance (where they employ staff) and goods-in-transit cover.Send the same written brief to all three installers
Give each company the same list of openings, materials, colours and priorities so you can compare quotes fairly.Compare quotes line by line using the 3-quote table
Check every item — system name, glass, whole-unit, security, hardware, colours, disposal, making good, guarantees, lead time and payment stages.U-value
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valuePut the 15 written questions before signing
Get written answers on who fits the windows, insurance, guarantees, making good, lead-time triggers and cancellation terms before you sign.Sign off the technical survey drawings before manufacture
Check every elevation, opening direction, glass type,,trickle vent
trickle vent: A trickle vent is a small controllable opening intended to provide background ventilation through or near a window frame. It is different from opening the sash and does not replace extraction where that is needed. Whether vents are required depends on the building, ventilation strategy and applicable rules, not appearance alone. More on trickle ventand colour on the survey sheet before the factory cuts a single frame.threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdInspect on fitting day and file your paperwork
Test every lock, hinge and seal before paying the final balance, and keep your written quote, contract, invoice and guarantee documents together.
Questions people also ask
How many quotes should I get for new windows and doors?
Aim for three like-for-like written quotes. One quote gives you no benchmark, while five or six often creates confusion unless every company is pricing the exact same specification and making-good scope.
What insurance should a window and door installer have?
Ask to see current public liability insurance (covering accidental damage to your home or injury), employer's liability insurance if they employ staff (a legal requirement of at least £5 million under the Employers' Liability (Compulsory Insurance) Act 1969), and confirmation of goods-in-transit cover for bespoke frames and glass.
What if a window installer is a sole trader with no employees?
Sole traders with no employees are generally exempt from compulsory employer's liability insurance, though they should still hold current public liability insurance. If they bring subcontract fitters onto your property, ask how those fitters are insured.
Why does goods-in-transit insurance matter for windows and doors?
Bespoke sliding doors, large glass units and painted frames are fragile and expensive to remake. Goods-in-transit cover confirms the installer bears the risk if a frame or sealed unit is damaged on the way to your home.
What guarantees should an installer give me in writing?
Ask for written details of both the product guarantees (frames, sealed glass units, hardware and paint/ finishes often have different durations) and the installer's workmanship guarantee, including who carries out any remedial work.
foil
foil (woodgrain): A woodgrain foil is a decorative surface layer bonded to a profile, commonly used on uPVC windows and doors to imitate painted or stained timber. It describes the finish, not the frame material. Texture, colour, corner joints and matching trims all affect how convincing the result looks on a real building. More on foil (woodgrain)Do I have a 14-day cooling-off period on new windows signed at home?
Off-premises contracts normally carry a 14-day cancellation right under the Consumer Contracts Regulations 2013, but Regulation 28(1)(b) excludes bespoke goods made to your specifications. Check your contract carefully to see whether the installer offers cancellation up to survey sign-off.
What should a technical survey include before windows are ordered?
A technical survey measures brick-to-brick and sizes in multiple places, checks squareness and support, confirms , , drainage, opening directions and glass specifications, and produces written elevation drawings for you to sign off before manufacture.
reveal
reveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveallintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintelcills
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillthresholds
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdShould a quote include making good plaster and trims?
Not every installer includes full plastering or decorating. Ask every company to state in writing exactly what making good is included (internal trims, plaster , window boards, external mortar and silicone) and what you will need to arrange separately.
reveals
reveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on revealShould I avoid installers who use subcontract fitters?
Not automatically — many reputable companies use long-standing specialist fitting teams. What matters is that the company you contract with accepts full legal responsibility, insures the work, supervises quality and handles aftercare directly.
Why are two quotes for the same windows £3,000 apart?
Big gaps usually come down to different frame systems, glass specifications, hardware quality, whether scaffolding and full plaster making good are included, or different guarantee terms. Compare every line in the 3-quote table before assuming the cheaper quote is better value.
Should a quote show the whole-window U-value or the centre-pane glass U-value?
Always ask for the whole-window (or whole-door) or (). Centre-pane glass figures ignore heat lost through the frame and glass edge spacer, so they do not tell you how the complete unit performs.
U-value
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valueWindow Energy Rating
Window Energy Rating: A Window Energy Rating is a label assessing a window as a complete product, taking account of heat loss, solar gain and air leakage. It is not the same measurement as a glass U-value. Compare labels for the proposed window configuration and consider the room orientation alongside the rating. More on Window Energy RatingWER
Window Energy Rating: A Window Energy Rating is a label assessing a window as a complete product, taking account of heat loss, solar gain and air leakage. It is not the same measurement as a glass U-value. Compare labels for the proposed window configuration and consider the room orientation alongside the rating. More on Window Energy RatingIs a 'today only' discount ever genuine?
Treat same-day expiry pressure as a red flag. Genuine glazing quotes are based on fabricator pricing and survey measurements; a trustworthy installer will give you a dated written quote and time to compare.
What should I check before paying the final balance?
Open, close and lock every window and door, inspect glass for scratches or debris inside the sealed unit, check perimeter seals and making good, confirm and keys are present, and list any snags in writing before releasing the final payment.
trickle vents
trickle vent: A trickle vent is a small controllable opening intended to provide background ventilation through or near a window frame. It is different from opening the sash and does not replace extraction where that is needed. Whether vents are required depends on the building, ventilation strategy and applicable rules, not appearance alone. More on trickle ventWhat are my rights if my new windows leak or draught after fitting?
Under the Consumer Rights Act 2015, goods must be of satisfactory quality and installation must be carried out with reasonable care and skill. Report the fault in writing with photos, follow the installer's complaints process first, and escalate via an ADR body, ombudsman or your statutory rights if unresolved.
What paperwork should I keep after my windows and doors are fitted?
Keep your itemised written quote, signed contract and survey drawings, paid final invoice, written product and workmanship guarantee documents, and any care or adjustment instructions together in your house file.
What if I want someone to sense-check my quotes before I choose?
You can send any quote to our free quote checker. The team will review the specification, highlight anything missing and usually replies by email within one working day — free, with no sales calls.
Sources and editorial review
- HSE — Employers' Liability (Compulsory Insurance) Act 1969: A brief guide for employers (HSE40) (current HSE guidance (HSE40 rev4)) — checked
- legislation.gov.uk — The Employers' Liability (Compulsory Insurance) Regulations 1998 (SI 1998/2573) (SI 1998/2573 (as enacted)) — checked
- legislation.gov.uk — Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, Part 3 (Regs 27–30) (SI 2013/3134) — checked
- legislation.gov.uk — Consumer Contracts Regulations 2013, Regulation 28 (bespoke goods exclusion) (SI 2013/3134) — checked
- legislation.gov.uk — Consumer Rights Act 2015, Section 9 (satisfactory quality) and Part 1 Chapter 4 (services) (2015 c. 15) — checked
- legislation.gov.uk — Consumer Rights Act 2015 Explanatory Notes (6-year / 5-year limitation periods) (2015 Explanatory Notes) — checked
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.