Opening up the back of the house with big glass doors
Short answer
Before opening up the rear wall, decide how the room and garden connection should work, then have the structure assessed. Choose the door layout with , drainage, comfort and access, not after the opening is built. Coordinate approvals and surveyed dimensions, manage support and installation in the agreed sequence, and finish with operation checks and completion paperwork.
thresholds
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdPlanning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
This is the route for changing an existing rear opening, distinct from adding an extension. The important hand-off is between structural work and the door set: neither contractor should assume the other owns the support, base preparation or final floor junction. Keep the existing-house security and weather plan visible throughout.
1. At idea stage: map the view and daily route
Draw furniture, kitchen units, garden access and usable wall space. Decide whether you need a full-width opening, a broad year-round view or a convenient everyday leaf. Check sunlight, privacy and how children, pets or a wheelchair user will cross the .
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold2. Before choosing an opening size: assess the structure and approvals
Have the retained wall and support assessed by the appropriate professional. Establish what approvals and inspections the alteration needs; temporary support and the permanent or steel must be planned by competent people. Do not remove masonry based on a door supplier’s drawing alone.
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintel3. Before detailed order: compare layouts and coordinate floors
Use comparisons and the bifold planner as decision aids, not engineering checks. Agree the exact door configuration, finished floor levels, , drainage and external paving. Include solar gain, ventilation, safety glass and the movement allowance above the door in the project specification.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold4. Before opening the wall and manufacture: agree the sequence
Name who prepares and checks the structural opening and who releases dimensions. Agree weather protection, security, delivery and glass lifting while the house is occupied. Coordinate inspections before support and junctions are concealed. Confirm the order timing against the actual opening readiness plan.
5. At installation and handover: test the whole connection
Check doors close, lock and move without force. Inspect seals, intended water paths, frame fixing and agreed finishes. Keep structural and completion evidence with the final door drawings and guarantees. Record how the hardware is serviced and how a large pane can be replaced after the garden is finished.
Questions to ask before you commit
- Do we want daily access, a full opening or the least interrupted view?
- Who designs permanent and temporary support?
- Who owns finished floor levels, drainage and opening readiness?
- How will the house remain secure and weather protected during the work?
Print this page to use the checklist on the day.
Paperwork to keep from design to completion
- Room and garden layout with opening options
- Structural design and temporary-work arrangements
- Applicable permission, building-control or warrant records
- , drainage, glazing and floor-level details
Threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold - Signed surveyed order, lifting and installation programme
- Inspection, completion, care and guarantee documents
Print this page to use the checklist on the day.
Official guidance: confirm your approval route
Read at the right decision point
Tools for the decisions ahead
What to do next
Questions people also ask
Can a builder widen the opening first and choose doors afterwards?
That can constrain the layout and cause or support problems. Coordinate the intended doors and structure before fixing the opening.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdDoes the bifold planner approve the structure?
No. It illustrates panel and stacking choices within its stated limits; the actual system and structural design need separate confirmation.
Can paving meet a flush threshold without drainage?
Do not assume that. Agree the tested and the site’s water route before floors and paving are installed.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdLast reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.