Answer
Do new-build windows need a SAP calculation?
Short answer
In England, a new home needs an energy calculation, normally using SAP, and the windows and doors form part of it. The windows do not get their own SAP, but their , sizes and glass properties feed the calculation. Scotland has its own energy requirements. Make sure the ordered windows match the figures assumed.
U-values
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valuePlanning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Yes — every new-build window feeds directly into the house's SAP model
Windows do not receive an individual SAP certificate of their own, yet every new dwelling in England requires a Standard Assessment Procedure (SAP) calculation under Approved Document L in which your windows' exact area, orientation, whole-unit (Uw) and solar are core inputs (Scotland runs its own SBEM/SAP-based domestic energy compliance through the building warrant). If you swap to a higher- window late in the build without re-running the model, the house can fail its as-built compliance check.
U-value
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valueg-value
g-value: A g-value describes the proportion of solar energy that passes through glazing into a room. A lower value means less solar heat enters, but it does not directly tell you how much visible light passes through. Consider it alongside light transmission, shading and the direction the glazing faces. More on g-valueU-value
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valueHow design-stage assumptions trip up self-builders on site
Under Approved Document L, Volume 1 (Table 1.1 notional dwelling 1.2 W/m²K and Table 4.1 limiting value 1.6 W/m²K; checked 24 November 2026), energy assessors often model windows near the 1.2 W/m²K notional benchmark at design stage. Months later, if the homeowner orders a higher- double-glazed slider without updating the model, the as-built SAP can fail after the doors are already plastered in. Send your chosen manufacturer's calculated whole-unit for every opening to the assessor before signing off manufacture.
U-value
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valueU-values
U-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-valueKeep the glazing thermal evidence for final building-control sign-off
Under current Part L photographic and documentary evidence rules, can ask for manufacturer thermal calculation sheets proving the installed windows match the as-built SAP input.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building controlWhat to check
- Send the assessor the exact window figures
- Recheck the calculation after any glazing change
- Keep product data and certificates for
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
Print this page to use the checklist on the day.
Official information
Questions people also ask
Who carries out the SAP calculation?
An accredited energy assessor, usually appointed by you or your designer.
Do I need triple glazing to pass?
Not necessarily. The result depends on the whole house; triple glazing is one option among several.
Is SAP needed for an extension?
Not always. It may be used where an extension exceeds the reference glazing or uses another compliance route. Ask .
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building controlLast reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.