What are fire escape windows and when are they required?

Short answer

An escape window provides a usable emergency exit, not just ventilation. Whether one is required depends on the room, storey and escape arrangement under the applicable building guidance. Check the clear opening and its accessibility with
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
. A large overall frame or an escape-hinge label does not prove the finished window is suitable.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.

What a fire escape window is for and who checks it

A fire escape (egress) window is an opening
sashsash: A sash is the framed part of a window that holds the glass; it often describes the moving part. In a sliding sash window, glazed sashes move vertically. The word alone does not identify the material, balance mechanism or cleaning action, so ask what the complete window description actually means. More on sash
designed to provide an emergency exit if fire blocks the internal stairs or corridor. In England, Approved Document B, Volume 1 (2019 edition incorporating 2020, 2022, 2025 and 2026 amendments, Section 2, paragraphs 2.10–2.11; checked 26 November 2026) sets emergency escape-window provisions for storeys up to a maximum of 4.5 m above ground level where a room relies on window escape, and replacement work must not make existing escape provision worse. Scotland's Domestic Technical Handbook sets separate criteria; confirm which rooms require an escape window with
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
or a
FENSAFENSA: FENSA is a competent person scheme for eligible replacement window and door installation work in England and Wales. A registered business can certify covered work through the scheme instead of using a separate building control application. Its certificate is not planning permission and does not establish that every kind of glazing project is covered. More on FENSA
/
CERTASSCERTASS: CERTASS operates a competent person scheme through which registered businesses can certify eligible replacement window and door installations in England and Wales. The scope of registration and the particular job matter. A scheme certificate addresses the relevant covered work; it is not planning permission, a Scottish building warrant or a universal project approval. More on CERTASS
-registered installer.

Official clear opening dimensions in England

Approved Document B, Volume 1 (2019 edition incorporating 2020, 2022, 2025 and 2026 amendments, Section 2, paragraph 2.10; checked 26 November 2026) states that an emergency escape window should have an unobstructed openable area with a minimum area of 0.33 m², a minimum height of 450 mm and a minimum width of 450 mm, and the bottom of the openable area a maximum of 1,100 mm above the floor. Because those measurements apply to the unobstructed openable gap rather than the outer frame, ask your installer to confirm the actual clear opening for the exact profile and hinge specification.

Hardware, restrictors and external landing checks

Approved Document B, Volume 1 (paragraph 2.10) notes that people escaping must be able to reach a place free from danger from fire, that windows should remain open without being held, and that locks (with or without removable keys) and opening stays with child-resistant release catches may be fitted. Ask your installer or
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
to confirm that egress hinges, handles and any restrictors suit the room's escape strategy before ordering, and check the
FENSAFENSA: FENSA is a competent person scheme for eligible replacement window and door installation work in England and Wales. A registered business can certify covered work through the scheme instead of using a separate building control application. Its certificate is not planning permission and does not establish that every kind of glazing project is covered. More on FENSA
/
CERTASSCERTASS: CERTASS operates a competent person scheme through which registered businesses can certify eligible replacement window and door installations in England and Wales. The scope of registration and the particular job matter. A scheme certificate addresses the relevant covered work; it is not planning permission, a Scottish building warrant or a universal project approval. More on CERTASS
or
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
certificate on handover.
England Approved Document B, Volume 1 (2019 ed. inc. 2020, 2022, 2025 & 2026 amendments, Section 2, paras 2.10–2.11; checked 26 Nov 2026)
CriterionEngland benchmark (AD B)Common site mistake
Unobstructed opening areaAt least 0.33 m²Measuring the brick opening instead of the clear open
sashsash: A sash is the framed part of a window that holds the glass; it often describes the moving part. In a sliding sash window, glazed sashes move vertically. The word alone does not identify the material, balance mechanism or cleaning action, so ask what the complete window description actually means. More on sash
aperture
Minimum clear width or heightAt least 450 mm in both directionsThick frames or standard hinges protruding into the clear gap
Maximum
sillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
height
No more than 1,100 mm above finished floorAdding a deep fixed bottom
transomtransom: A transom is a horizontal dividing member within a window or glazed screen. It separates upper and lower lights or sections, and may help support the assembly. It is not necessarily a decorative bar. Its position affects the elevation, view and the relationship between fixed glazing and opening windows. More on transom
that pushes the opener too high
Storey limitRooms up to 4.5 m above external groundAssuming upper-storey loft rooms can rely on a window instead of a protected stair

What to check

  • Agree the escape strategy for the room
  • Confirm usable opening,
    sillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
    position and outside conditions
  • Check restrictors and the demonstrated opening action

Print this page to use the checklist on the day.

Official information

Fire escape and egress

Escape windows must provide the required unobstructed clear opening and safe exit route under Approved Document B (or Scottish
Building Standardsbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
). Check handle, lock and restrictor choices with
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
or a
FENSAFENSA: FENSA is a competent person scheme for eligible replacement window and door installation work in England and Wales. A registered business can certify covered work through the scheme instead of using a separate building control application. Its certificate is not planning permission and does not establish that every kind of glazing project is covered. More on FENSA
/
CERTASSCERTASS: CERTASS operates a competent person scheme through which registered businesses can certify eligible replacement window and door installations in England and Wales. The scope of registration and the particular job matter. A scheme certificate addresses the relevant covered work; it is not planning permission, a Scottish building warrant or a universal project approval. More on CERTASS
-registered installer before ordering.

Handles and restrictors

Ask your installer or
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
to confirm that egress hinges, locks and any child-resistant release catches suit the room's fire-escape strategy.

Checklist

  • Confirm escape requirements with
    building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
    or your installer
  • Check handle and lock suitability for escape windows
  • Check restrictors release reliably

Print this page to use the checklist on the day.

Official and recognised sources — last checked 2026-11-24

Questions people also ask

Does every bedroom need an escape window?
Do not apply a blanket rule. The room, storey and protected escape arrangement must be assessed.
Does a tilt position count as an escape opening?
Not by itself. Check the full usable escape action and clear opening.
Can replacement windows reduce an existing escape opening?
Do not worsen required escape provision. Have the proposed opening checked before ordering.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page