How should glazing be fitted in a new extension before plastering?
Short answer
Before plastering, glazing should be supported, sealed and checked at the agreed building interfaces, with concealed evidence recorded. Coordinate the builder’s membranes, floor levels and work with the installer. Receive a readiness and protection record; finishing early must not hide incomplete joints or expose new products to avoidable site damage.
reveal
reveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on revealPlanning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Before plastering, glazing should be supported, sealed and checked at the agreed building interfaces, with concealed evidence recorded. Coordinate the builder’s membranes, floor levels and work with the installer. Receive a readiness and protection record; finishing early must not hide incomplete joints or expose new products to avoidable site damage.
reveal
reveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on revealWhat you should receive
- The pre-fitting readiness record.
- Joint photographs before plastering.
- A wet-trade protection and handover plan.
Print this page to use the checklist on the day.
Warning signs
- Plaster conceals an unfinished membrane.
- Products are unprotected during wet work.
- Changed openings are not resurveyed.
Relevant UK rules
Extensions have project-wide energy, ventilation and safety requirements. Inspection and completion evidence belong to the agreed building-control or Scottish warrant route; installing the windows does not complete the whole extension’s approval.
Official information
The full survey and installation process
Step by step
Set the readiness hold point
Confirm the built openings and the latest drawings before delivery. Ask who checks support,levels and builder work. Plastering should not be the event that forces unresolved glazing details into place. If construction differs from survey, return the change to the designer and supplier before fitting.threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdComplete and inspect interfaces
The glazing installer and builder should coordinate the air, weather and moisture connections. Ask for photographs before plaster covers the edges. Test opening and locking while adjustments remain accessible. Necessary inspections and building-control evidence should be identified in the programme rather than remembered after finishing.Complete and inspect interfaces Protect through the wet trades
Agree protection, cleaning and room ventilation while plaster and other wet materials are used. Keep drains and mechanisms clear and follow the maker’s care instructions. At handover, distinguish site moisture from glazing defects and record unfinished interfaces. Protection should not be fixed in ways that damage coatings or hardware.
Questions people also ask
What should I agree before the work starts?
Confirm the built openings and the latest drawings before delivery. Ask who checks support, levels and builder work. Plastering should not be the event that forces unresolved glazing details into place. If construction differs from survey, return the change to the designer and supplier before fitting.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdWhat evidence should I keep?
The pre-fitting readiness record. Joint photographs before plastering. A wet-trade protection and handover plan.
What should make me stop and ask questions?
Plaster conceals an unfinished membrane. Products are unprotected during wet work. Changed openings are not resurveyed.
Last reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy