How bifold doors are fitted
Short answer
Bifolds are fitted in stages: prepare a square, level opening with sound structure above, set the and with drainage, fix the outer frame plumb and true, hang and adjust the panels, then seal and make good. Getting the frame perfectly level is what makes them run smoothly for years.
cill
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillthreshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdPlanning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
A bifold is less forgiving than a window. If the frame is twisted or the head sags, the panels will drag, the gaps will vary and the locks will be stiff. This is what a careful fit looks like.
Before fitting day
- The opening has been surveyed and the drawings signed off
- Any steel or above is in and designed not to deflect onto the door
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintel - Floor levels inside and out are known, including the finished floor
- Drainage outside the is planned
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
Warning signs after fitting
- Panels that drag on the track or need force to fold
- Uneven gaps between panels
- Water standing on the after rain
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold - Fixings visible only as foam, with no mechanical fixings
Official information
Survey and installation checklists
Step by step
Prepare the opening
The old door and frame come out. The opening is checked for square, level and plumb, and the structure above is checked. Any problems are fixed before the new frame goes in.Prepare the opening Set the cill and threshold
Theorcill
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillis laid perfectly level on a solid bed, with drainage arranged so water runs away from the house. For a flushthreshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold, a drainage channel is set outside.threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdSet the cill and threshold Fix the outer frame
The frame is set on the, packed and fixed into the structure with mechanical fixings at the right spacing. It is checked diagonally so it is square and not twisted.threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdFix the outer frame Hang the panels
Panels are hung on the top or bottom track and hinged together. Heavy panels may need two or more fitters.Hang the panels Adjust
Rollers and hinges are adjusted so every panel folds smoothly, the gaps are even and the locks engage without force.Adjust Seal and make good
Gaps around the frame are insulated and sealed inside and out. Trims are fitted and the surrounding area is made good as agreed. The team shows you how to use and lock the doors.Seal and make good
Questions people also ask
How long does fitting take?
It depends on the size and the work needed around the opening. Ask your installer for a realistic plan.
Do bifolds need a level floor?
They need a level . The floor inside should be planned to meet it at the right height.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdLast reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy
Checked by the trade team
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.