Skip to content

Free guidance. No fees. No sales calls.

Free guidance. No fees. No sales calls.

Survey and fitting

How are Velfac aluclad windows fitted?

Short answer

Velfac aluclad windows need coordinated support, frame position and connections to the building’s air and weather layers. Ask for the exact configuration and current installation instructions before fitting. Receive concealed-work evidence and an operation demonstration; the aluclad label does not establish the thermal result or suitability of your replacement-window specification.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Velfac aluclad windows need coordinated support, frame position and connections to the building’s air and weather layers. Ask for the exact configuration and current installation instructions before fitting. Receive concealed-work evidence and an operation demonstration; the aluclad label does not establish the thermal result or suitability of your replacement-window specification.

What you should receive

  • The exact range, glazing and instruction record.
  • The coordinated membrane and support evidence.
  • Configuration-specific performance and care documents.

Print this page to use the checklist on the day.

Warning signs

  • A brand name is offered as thermal proof.
  • Membrane connections remain unfinished.
  • Another range’s figure is used for your order.

Relevant UK rules

Replacement performance must be confirmed for the actual configuration and glazing. The shared Velfac guidance below states the published figures and their limits without declaring any unidentified product compliant or non-compliant.

Official information

The full survey and installation process

Velfac and replacement-window U-values

  • The published VELFAC 200 whole-window figure (1.5 W/m²K) is above the 1.4 W/m²K limit for replacement windows in England and Scotland.
  • VELFAC In is published at 0.82 W/m²K.
  • For replacement windows, ask your installer for the
    U-valueU-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value
    of the exact configuration and glazing, and make sure it meets 1.4 or better.
These are published figures for the named products, not a pass or fail judgement on every configuration. A brochure value must not be substituted for the whole-window value of the windows being ordered.

Published figures and replacement-window rules — checked 23 November 2026

Step by step

  1. Confirm the configuration and evidence

    Match the exact Velfac range, glazing and opening arrangement to the order. Ask the supplier for configuration-specific thermal evidence and the installation instructions. Coordinate the intended frame position with the designer. Do not infer replacement compliance from the brand name or a published figure for another range.
  2. Connect the building interface

    The installer follows the system-specific bearing, fixing and seal detail, with builder membranes coordinated rather than left disconnected. Ask for photographs before linings and covers conceal the joint. Timber-frame movement or irregular masonry may require a designer’s detail. Protect finishes and materials from inappropriate handling or site moisture.
    fixings and packers
    Connect the building interface
  3. Check and hand over

    Demonstrate the exact opening functions and locks with the fitter. Keep care instructions for internal timber, external cladding and hardware. Record unfinished membrane or
    revealreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
    work and its owner. Where another configuration or system better meets the project detail, resolve that before manufacture rather than making an unsupported product claim.

Disclosure: Partner installers in the areas we cover fit this system.

Questions people also ask

What should I agree before the work starts?
Match the exact Velfac range, glazing and opening arrangement to the order. Ask the supplier for configuration-specific thermal evidence and the installation instructions. Coordinate the intended frame position with the designer. Do not infer replacement compliance from the brand name or a published figure for another range.
What evidence should I keep?
The exact range, glazing and instruction record. The coordinated membrane and support evidence. Configuration-specific performance and care documents.
What should make me stop and ask questions?
A brand name is offered as thermal proof. Membrane connections remain unfinished. Another range’s figure is used for your order.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Checked by the trade team

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page