Short answer

Building regulations cover more than heat loss: windows and doors can affect ventilation, escape, safety glass, access and structural support. England and Scotland use different approval systems. Establish which requirements apply, assign the design and certification responsibilities, and order products with evidence for the exact configuration. Keep the approval and completion records after installation.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
The replacement-approval answer explains that approval may be needed; this guide builds a compliance workflow for replacements, alterations and new work. It is general information, not building-regulations advice. The published thermal context below is already maintained in our shared dataset, but your project team must confirm the rules and editions applying to your work.

1. Choose the right approval route

Tell the relevant authority whether this is replacement, a new opening, an extension or a new dwelling. In England, qualifying replacement work may use a registered competent person scheme or
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
. In Scotland, confirm the warrant and standards position with the council. Planning permission and ownership consent remain separate; neither proves the technical requirements have been met.

2. Make an opening-by-opening requirements schedule

Record which openings provide escape, background ventilation, safe access or guarding and where safety glass is needed. Add structural support and weather-resistance details for widened openings. Ask the designer to coordinate these requirements rather than accepting an energy-efficient frame that removes an essential opening function. The relevant dimensions and performance targets must be confirmed for the property before manufacture.

Before moving on

  • Approval responsibility is named
  • Escape and ventilation are not lost
  • Evidence matches whole products and actual sizes

Print this page to use the checklist on the day.

3. Check the configured product evidence

Use whole-window and whole-door thermal values, not glass-only centre-pane figures. Match security, glass and weather evidence to the sizes and opening types being ordered. The published thermal limits below are regulatory context, not a claim that every product in a material category complies. Confirm current requirements with
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
and have the energy assessor review substitutions on calculated projects.

4. Plan inspection and handover

Agree who arranges certification or inspections and what records must be provided. Photograph concealed fixings and relevant interfaces if required by the agreed process, and retain delivery labels and performance documents. Record deviations before they disappear behind plaster or trims. Check the installed opening actions, vents and hardware against the schedule and obtain the applicable completion evidence.

Published figures and their limits

Published window regulatory context, not product performance

Must meet building regulations. England, replacement windows: maximum
U-valueU-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value
1.4 W/m²K or
Window Energy RatingWindow Energy Rating: A Window Energy Rating is a label assessing a window as a complete product, taking account of heat loss, solar gain and air leakage. It is not the same measurement as a glass U-value. Compare labels for the proposed window configuration and consider the room orientation alongside the rating. More on Window Energy Rating
band B. England, new homes: limiting
U-valueU-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value
1.6 W/m²K (notional 1.2). Scotland: maximum 1.4 W/m²K. Check the whole-window
U-valueU-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value
of the exact product.

Sources — checked 2026-11-23

Published glazed-door regulatory context

Must meet building regulations. England, replacement doors over 60% glazed: maximum 1.4 W/m²K or
DSERDSER: DSER means Door Set Energy Rating. It assesses an external door set as a complete assembly rather than judging the door glass on its own. The rating takes account of energy performance, including heat loss and air leakage. Ask whether the label covers the exact leaf, frame and glazing proposed. More on DSER
band C. England, new homes: limiting 1.6 W/m²K (notional 1.2). Scotland: maximum 1.4 W/m²K. Check the whole-door
U-valueU-value: A U-value describes how readily heat passes through a building element. A lower value means less heat loss through that element. For windows and doors, distinguish the complete assembly from the glass alone: a good glass figure does not establish the performance of the frame, edges and finished product. More on U-value
of the exact product.

Sources — checked 2026-11-23

Published other-door regulatory context

Must meet building regulations. England, replacement doors (60% glazed or less): maximum 1.4 W/m²K or band B. England, new homes: limiting 1.6 W/m²K (notional 1.0). Scotland: maximum 1.4 W/m²K.

Sources — checked 2026-11-23

Your project checklist

  • Confirm the nation and work category
  • Check safety and escape needs
  • Agree structural support
  • Verify whole-product thermal evidence
  • Arrange inspections or certification
  • Keep completion records

Print this page to use the checklist on the day.

What to do next

Give the designer or installer an opening schedule with the intended uses and proposed changes. Ask the relevant authority to confirm the approval route and requirements. Resolve each compliance item before drawing approval, then use the installation checklist to check the work and paperwork at handover.

Relevant answers and comparisons

Useful tools

Official information

Related pages on this topic

Questions people also ask

Is an efficient glass unit enough?
No. Whole-product performance and the installation matter, alongside safety, ventilation, escape, access and any structural requirements.
Do new builds use the replacement certificate route?
Do not assume so. New dwellings have their own
building controlbuilding control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control
or warrant process and whole-building performance requirements.
Are England and Scotland limits the same?
Some published values overlap, but approval routes and detailed requirements differ. Confirm the applicable standards for the location and type of work.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page