The complete guide to bifold and sliding door costs
Free guidance. No fees. No sales calls.
Short answer
The door price is only part of the cost of a wide glazed opening. Budget for the structure, glass, access, lifting, drainage and making good as well as the frame. Compare the same opening and specification. Published bifold ranges provide context; sliding door totals depend on your exact width, track system and groundworks.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdPlanning this? Get a free, no-obligation installer recommendation
A door comparison decides how you use the opening; a cost plan decides whether the entire opening can be delivered. Work through the design, building work and fitting together. A cheaper door does not help if its , panel arrangement or delivery route makes the rest of the project more complicated than the alternative.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold1. Set the opening and everyday use
Draw the opening with the doors closed and open, including the folded stack or fixed sliding pane. Decide whether you need a and where people will walk. Test furniture and paving clearances before pricing. Panel counts affect both fabrication and fitting, so use the planner as a starting point, then ask the supplier to confirm the exact configuration.
traffic door
bifold traffic door: A bifold traffic door is a leaf that can be used for everyday passage without folding the full door set back. Its availability depends on the panel arrangement and system. It can make trips to the garden simpler, but its handle, lock and opening space still need checking in the proposed layout. More on bifold traffic door2. Price the surrounding building work
For an enlarged opening, ask the designer about the or steel, supports and deflection limits. Identify who builds the opening, sets the base and forms the drainage. Price internal floors and external paving to the agreed levels rather than assuming they will meet a low automatically. Include temporary weather protection if the building will be open between trades.
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintelthreshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdBefore moving on
- Opening action is drawn on the furniture plan
- Structure and drainage have named owners
- Delivery and lifting are included or separately priced
Print this page to use the checklist on the day.
3. Compare the door packages
Ask for frame, glass, hardware, finish, and details against the same opening. Separate survey, delivery, lifting, fitting and disposal from builder work. The published bifold range below is not a quote for a particular system; ask suppliers to price the slider against the exact same opening. Ask which changes to panel count or glass specification cause a price revision.
cill
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillthreshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold4. Freeze the design before spending
Get the section and structural opening signed off before manufacture. Confirm where large glass can be unloaded and whether specialist lifting is included. Check the installer has allowed for adjustment and a return visit if required. Compare the whole delivered opening, not simply the cheapest door line, and retain agreed prices for any optional changes.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdPublished figures and their limits
Published overall bifold guide range
All bifold doors: £2,500 to £8,000 installed (MyBuilder, last updated 23 Oct 2026). Three-panel installed: uPVC £1,950 to £2,800, aluminium £3,150 to £4,650; each extra aluminium panel adds £650 to £1,500 (ExpertSure, verified Nov 2026, 20% VAT applies; checked 25 Nov 2026) (typical published UK range, supplied and fitted).
Sources — checked 2026-11-25
Sliding door price
Aluminium sliding doors: £1,800 to £4,200 (average £3,000; Checkatrade cost guide, last updated Aug 2023, excl. VAT — prices may have risen since; checked 25 Nov 2026); MyBuilder price guide, last updated 21 Aug 2026 (checked 25 Nov 2026), lists sliding patio doors averaging around £1,500 overall, with aluminium door material costs at £1,200 to £6,000 plus £400 to £700 for standard installation (typical published UK range, supplied and fitted).
Sources — checked 2026-11-25
Prices are published guide figures from the sources listed, not our own quotes. Installed prices vary by UK region, access, glazing specification and making good.
Your project checklist
- Check the stack or fixed pane position
- Agree inside and outside levels
- Obtain an itemised structural-work price
- Confirm glass and hardware
- Budget for access and weather protection
- Keep the approved section
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
Print this page to use the checklist on the day.
What to do next
Use the bifold planner to discuss layouts, then obtain like-for-like door quotations and a separate building-work scope. Ask your designer and installer to agree the detail together. Reconcile both prices before choosing a system or paying towards made-to-measure manufacture.
threshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdRelevant answers and comparisons
Useful tools
Questions people also ask
Is a slider always cheaper than a bifold?
No. Glass size, track arrangement, hardware, fitting and structure can reverse the comparison. Ask both suppliers to price the actual opening.
Does the published range include a new steel?
Do not assume so. The surrounding structural work must be identified separately unless the quotation explicitly includes it.
Can I save by adding panels later?
Usually the frame and tracks are designed for the ordered configuration. Treat a later reconfiguration as a new design enquiry, not an assumed upgrade.
Last reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy