Skip to content

Free guidance. No fees. No sales calls.

White sash windows and a natural timber casement in a British red-brick home

Guide

What should making good outside include after window fitting?

Free guidance. No fees. No sales calls.

Short answer

External making good should restore the agreed weather detail and surrounding finish without obstructing drainage. Ask who repairs brick, render or stone and how colour or texture differences are handled. Receive a recorded scope before work starts; a neat sealant line cannot compensate for loose masonry or a defective
cillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
junction.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
External making good should restore the agreed weather detail and surrounding finish without obstructing drainage. Ask who repairs brick, render or stone and how colour or texture differences are handled. Receive a recorded scope before work starts; a neat sealant line cannot compensate for loose masonry or a defective
cillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
junction.

What you should receive

  • The external repair and matching scope.
  • Weather-joint and
    cillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
    photographs.
  • The outstanding-work and maintenance record.

Print this page to use the checklist on the day.

1. Record the external finish

Photograph the existing wall, pointing and render around each opening. Ask how removal will affect the surface and what the quoted repair includes. Matching aged materials may not be exact, so agree a sample or acceptable approach where appearance matters. Protected properties may need approval before visible changes.

2. Check the repair and joint

Ask the contractor to repair soundness before applying the weather seal.
Cillscill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
, corner junctions and frame-to-wall joints must connect to the intended moisture detail. Drainage openings should remain clear. Do not request an extra continuous bead of sealant where it could trap water or cover a necessary outlet.
insulate, seal and trim
Simplified principle only: the exact system and building detail must be designed and checked for your project.

3. Inspect and document

Look for loose material, open junctions and the agreed finish from safe ground-level access. Ask for photographs of inaccessible areas rather than climbing equipment. Record differences and follow-up work before sign-off. Keep product and repair instructions so later decoration or landscaping does not compromise the joint.

Warning signs

  • Sealant bridges loose or crumbling masonry.
  • Drainage outlets disappear under render.
  • Exterior repairs are left without an owner.

Relevant UK rules

Moisture resistance and the building joint remain part of the applicable technical requirements. Planning or listed-building restrictions can also affect the external appearance; confirm the local position before changing significant finishes.

Official information

The full survey and installation process

Related pages on this topic

Questions people also ask

What should I agree before the work starts?
Photograph the existing wall, pointing and render around each opening. Ask how removal will affect the surface and what the quoted repair includes. Matching aged materials may not be exact, so agree a sample or acceptable approach where appearance matters. Protected properties may need approval before visible changes.
What evidence should I keep?
The external repair and matching scope. Weather-joint and
cillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
photographs. The outstanding-work and maintenance record.
What should make me stop and ask questions?
Sealant bridges loose or crumbling masonry. Drainage outlets disappear under render. Exterior repairs are left without an owner.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Checked by the trade team

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page