
Guide
Preparing a glazing package for tender
Free guidance. No fees. No sales calls.
Short answer
A comparable glazing tender needs a coordinated opening schedule, drawings, performance brief and installation scope. State provisional dimensions, design responsibilities, interfaces, access and programme assumptions. Ask bidders to return exclusions, deviations and evidence in a consistent format. Resolve changes before award, then carry the agreed package into survey, fabrication drawings and the final contract.
Planning this? Get a free, no-obligation installer recommendation
The drawing-package answer lists documents; this guide turns them into a procurement workflow. The tender should explain what must be priced, where alternatives are allowed and what information remains provisional. A pile of plans without a scope matrix leaves bidders to make different assumptions about glass, supports, membranes, lifting and the installation handover.
1. Create one coordinated schedule
Reference every opening on plans and elevations and list sizes, action, handing, glass, ventilation, hardware and colours. State performance requirements and the relevant calculation or design assumptions. Include key head, jamb, and sections. Mark which dimensions are structural, which are frame sizes and which remain provisional so pricing and eventual manufacture do not use incompatible interpretations.
cill
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillthreshold
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold2. Define scope and design interfaces
Allocate survey, detailed design, structural checks, brackets, membranes, , drainage, delivery, lifting and fitting. Include removal and making good for existing buildings. Describe access constraints, site readiness, storage and temporary weather protection. State who checks built openings and coordinates the final dimension sign-off. Separate contractor-designed elements and review duties rather than leaving responsibility implied by a generic supply-and-fit phrase.
cills
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillBefore moving on
- Schedules and elevations use matching references
- Provisional dimensions are labelled
- Interfaces and contractor design are allocated
Print this page to use the checklist on the day.
3. Specify a consistent tender return
Ask bidders for the base specification price, optional alternatives, exclusions, provisional sums and programme dependencies in separate sections. Require evidence and a deviation schedule so substitutions are visible. Compare tax, access and aftercare on the same basis. If bidders raise different assumptions, issue a clarification to everyone involved rather than quietly correcting only the preferred quotation.
4. Close clarifications before award
Resolve significant deviations with the designer and energy assessor where relevant. Incorporate agreed answers in the final schedule, contract and responsibility matrix. Record the tender and drawing revisions being accepted, including any still-provisional items and the route to settle them. Confirm survey, fabrication review and programme milestones so the awarded package can become an order without another round of unexplained assumptions.
Your project checklist
- Issue the same package to bidders
- State acceptable alternatives
- Ask for exclusions and deviations
- Compare access and programme assumptions
- Record all clarifications
- Carry revisions into the contract
Print this page to use the checklist on the day.
What to do next
Prepare a tender checklist and responsibility matrix alongside the schedule. Ask bidders to use a standard return format, then compare deviations before totals. Close the important interfaces and issue the final coordinated revision as the basis for appointment, survey and fabrication review.
Relevant answers and comparisons
Useful tools
Questions people also ask
Are elevations enough to get comparable prices?
Not reliably. Actions, performance, glass, interfaces and installation scope need an explicit schedule or bidders will make different assumptions.
Should tender dimensions be final manufacturing sizes?
State clearly what they represent. If provisional, define the later survey and verification process before manufacture.
How should alternatives be returned?
Separately from the compliant base offer, with deviations and supporting evidence. That allows cost savings to be assessed without disguising a changed requirement.
Last reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.