What should a survey check about thresholds and drainage?

Free guidance. No fees. No sales calls.

Short answer

A
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
survey must join the finished floor, door
sillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
and outside drainage into one detail. A low-looking
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
is not automatically accessible or weatherproof. Ask for the proposed levels, external falls and drainage route in writing, including who builds each part before the door is ordered or fitted.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
A
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
survey must join the finished floor, door
sillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
and outside drainage into one detail. A low-looking
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
is not automatically accessible or weatherproof. Ask for the proposed levels, external falls and drainage route in writing, including who builds each part before the door is ordered or fitted.

What you should receive

  • A combined floor and
    thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
    detail.
  • The drainage outlet and maintenance arrangement.
  • Written builder and installer responsibilities.

Print this page to use the checklist on the day.

1. Establish finished levels

Discuss the actual floor build-up, not just the current slab. Record internal finishes, external paving and any later landscaping. Ask where the door frame sits in the wall and how the chosen
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
connects to damp protection. Changes by the builder must reach the door supplier before manufacture.

2. Draw the drainage route

Ask the contractor to show where water entering the track drains and how surface water is kept away. An exposed site may need a different
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
arrangement. A channel outside is not a complete solution unless its outlet, maintenance access and connection to surrounding levels are resolved.
insidefalls awaylevel threshold
Simplified principle only: the exact system and building detail must be designed and checked for your project.

3. Agree responsibility and check

Put the builder’s drainage and floor work alongside the installer’s
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
detail. Confirm which work must be inspected before the frame is fixed. At handover, check that paving, sealant and floor finishes have not covered outlets. Obtain care instructions for clearing the actual system’s drainage paths.

Warning signs

  • Paving is planned above drainage outlets.
  • A flush finish is promised without a detail.
  • Water discharge has no agreed destination.

Relevant UK rules

Accessibility and resistance to moisture must be considered together. England’s access guidance and Scotland’s relevant standards are not interchangeable. Confirm what applies to a replacement, extension or new dwelling before selecting the
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
.

Official information

The full survey and installation process

Driving rain and threshold drainage

Driving rain tests
thresholdsthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
and
cillscill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
. Ask how water will drain away from door
thresholdsthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
, whether a channel drain is needed, and how the outside ground levels will be set.

Drainage options

Channel drains, canopies and correctly set ground levels reduce water risk.

Checklist

  • Ask about channel drains
  • Check ground levels
  • Consider a canopy

Print this page to use the checklist on the day.

Questions people also ask

What should I agree before the work starts?
Discuss the actual floor build-up, not just the current slab. Record internal finishes, external paving and any later landscaping. Ask where the door frame sits in the wall and how the chosen
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
connects to damp protection. Changes by the builder must reach the door supplier before manufacture.
What evidence should I keep?
A combined floor and
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
detail. The drainage outlet and maintenance arrangement. Written builder and installer responsibilities.
What should make me stop and ask questions?
Paving is planned above drainage outlets. A flush finish is promised without a detail. Water discharge has no agreed destination.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Checked by the trade team

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page