
Guide
What a fair window and door contract should include
Free guidance. No fees. No sales calls.
Short answer
A clear contract identifies the businesses, the exact products and drawings, the installation scope, price, payments, programme and responsibility for changes or defects. It should make survey, access, making good, certification and aftercare explicit. Read bespoke-order and cancellation terms before signing. Fairness depends on the actual terms and circumstances, so seek appropriate advice where unsure.
Planning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
The quote-inclusions answer helps compare offers; the contract must turn the accepted offer into a complete record of obligations. This guide is general information, not legal advice. A drawing, guarantee and payment schedule may form different parts of the agreement, so ask which versions apply and what happens if their wording conflicts.
1. Identify the parties and contract documents
Record the legal supplier, installer and customer, with the property address and contact route. List the dated quotation, numbered schedule, approved drawings and terms that form the agreement. State whether the supplier also surveys and whether any builder-prepared openings must be accepted before manufacture. Confirm cancellation and bespoke-production terms before paying or approving drawings.
2. Define the goods and work
Specify actions, handing, glass, colours, hardware, and for each item. State protection, removal, disposal, fixings, seals, making good and decorating limits. Include access, lifting, membranes or drainage where relevant, with exclusions allocated to another named party. A vague promise to fit professionally is not a substitute for agreeing what finished work you will receive.
thresholds
threshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on thresholdcills
cill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cillBefore moving on
- All contract documents have dates or revisions
- Survey and opening responsibility are explicit
- Goods and finished installation scope are defined
Print this page to use the checklist on the day.
3. Make programme and changes manageable
Record the price, tax, allowances, payment triggers and the event that starts the lead time. Explain how delays are reported and how revised dates are agreed. Set a written variation process covering design, price and programme effects before additional work proceeds. State who can approve changes and what happens if the survey alters sizes, structure or the originally quoted specification.
4. Agree defects and handover obligations
Specify the walk-round, snag list, adjustment process and required certificates, warranties and care information. Read exclusions, claims routes and any dispute procedure without assuming a guarantee replaces other rights. Clarify how incomplete or contested work relates to final payment. If wording is unclear or appears unfair, obtain appropriate consumer or legal advice rather than relying on a general contract checklist.
Your project checklist
- Name the legal businesses
- Match drawings to the quotation
- Record price and payment triggers
- Define exclusions and allowances
- Agree written variations
- Specify handover and complaints
Print this page to use the checklist on the day.
What to do next
Ask for the complete contract pack and compare it against the final quotation and drawings. Resolve contradictions in writing before signing. Keep the accepted versions together and use them to check survey changes, payment requests and handover.
Relevant answers and comparisons
Useful tools
Official information
Questions people also ask
Is a signed quote a contract?
It may form an agreement, depending on the terms and circumstances. Read everything incorporated into it and seek advice if the obligations are unclear.
Can bespoke windows be cancelled like stock goods?
Do not assume the same rules apply. Check the contract and relevant consumer guidance before approving made-to-measure manufacture.
Can the installer change the product after survey?
A necessary change should be explained and agreed through the documented variation process. Do not treat an unapproved substitute as automatically equivalent.
Last reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.