Guide
What happens if a window or door opening needs a new lintel?
Free guidance. No fees. No sales calls.
Short answer
If the opening needs new support, obtain an appropriate structural design and resolve approvals before removing the existing support or frame. The glazing contractor should not improvise a solution on fitting day. Receive the designed detail, safe sequence and revised opening record, with clear responsibility for any change to the order.
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintelPlanning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
If the opening needs new support, obtain an appropriate structural design and resolve approvals before removing the existing support or frame. The glazing contractor should not improvise a solution on fitting day. Receive the designed detail, safe sequence and revised opening record, with clear responsibility for any change to the order.
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintelWhat you should receive
- The structural design and approval record.
- The safe work and responsibility arrangement.
- A revised opening and order-readiness record.
Print this page to use the checklist on the day.
1. Pause and assess
Ask the contractor to record why support is uncertain or inadequate. Keep people clear of potentially unstable work. An appropriate structural professional should assess the opening and determine the required solution. Homeowners should not choose a beam size from a generic guide or authorise unsupported removal.
2. Coordinate design and work
Agree who installs the support, obtains any approval and manages temporary works. The design can affect the finished aperture, head movement and door order. Send the final detail to the glazing supplier and builder together. A structural change should not remain only in one trade’s notebook.
3. Inspect before fitting resumes
Confirm the agreed support and opening readiness at the appropriate hold point. Keep the design and inspection evidence with the revised glazing schedule. Ask how additional cost and programme effects follow the contract. Resume fitting only after the responsible professional or contractor has resolved the structural and dimensional issues.
Warning signs
- The installer guesses a size.
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintel - Support is removed before assessment.
- The changed aperture never reaches the supplier.
Relevant UK rules
Structural alterations need the applicable design and approval route. Building-control or Scottish warrant requirements depend on the work; this guide gives no beam specification or temporary-support instructions.
Official information
The full survey and installation process
Questions people also ask
What should I agree before the work starts?
Ask the contractor to record why support is uncertain or inadequate. Keep people clear of potentially unstable work. An appropriate structural professional should assess the opening and determine the required solution. Homeowners should not choose a beam size from a generic guide or authorise unsupported removal.
What evidence should I keep?
The structural design and approval record. The safe work and responsibility arrangement. A revised opening and order-readiness record.
What should make me stop and ask questions?
The installer guesses a size. Support is removed before assessment. The changed aperture never reaches the supplier.
lintel
lintel: A lintel is a structural member above an opening that carries loads from the wall or construction above. Its material and design depend on the building. A window or door frame is not a substitute for that support, and widening an opening requires assessment of the structure and its movement. More on lintelLast reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy