Short answer

Your survey report should let you match every ordered item to an opening and understand the installation detail. It needs the specification, relevant building findings, exclusions and unresolved questions, not just a price. Keep dated drawings and approval records so a later change cannot silently replace what you agreed to buy.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Your survey report should let you match every ordered item to an opening and understand the installation detail. It needs the specification, relevant building findings, exclusions and unresolved questions, not just a price. Keep dated drawings and approval records so a later change cannot silently replace what you agreed to buy.

What you should receive

  • The final dated opening schedule.
  • The installation details and exclusions.
  • A revision and approval record.

Print this page to use the checklist on the day.

1. Match the opening schedule

Check room references, dimensions, opening direction and the agreed position in the wall. Compare glass, colours, vents and hardware with the quotation. Ask the surveyor to distinguish confirmed information from assumptions. A schedule using only supplier codes is not enough if you cannot identify the items.

2. Read the installation detail

Look for the
cillcill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
,
thresholdthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
, seals, access and making-good scope where these affect the job. Structural or drainage issues should identify a responsible person and a hold point. Ask what remains outside the surveyor’s assessment so another professional can resolve it before manufacture.
lintelrevealtransommullioncill
Simplified principle only: the exact system and building detail must be designed and checked for your project.

3. Approve the correct revision

Keep the final dated report and drawings with a written authorisation record. If anything changes, ask for a revised schedule and explanation of price or programme effects. Do not sign a document you have not been given time to read or one with important blanks left for later.

Warning signs

  • The report contains unresolved blank fields.
  • You receive no copy of signed drawings.
  • Assumptions are presented as confirmed facts.

Relevant UK rules

A survey report is not itself planning consent or completion certification. It should identify the required approval route and the technical evidence needed for the actual work, with responsibility for obtaining it.

Official information

The full survey and installation process

Related pages on this topic

Questions people also ask

What should I agree before the work starts?
Check room references, dimensions, opening direction and the agreed position in the wall. Compare glass, colours, vents and hardware with the quotation. Ask the surveyor to distinguish confirmed information from assumptions. A schedule using only supplier codes is not enough if you cannot identify the items.
What evidence should I keep?
The final dated opening schedule. The installation details and exclusions. A revision and approval record.
What should make me stop and ask questions?
The report contains unresolved blank fields. You receive no copy of signed drawings. Assumptions are presented as confirmed facts.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Checked by the trade team

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page