Guide
What should happen if the wrong size or colour is delivered?
Free guidance. No fees. No sales calls.
Short answer
Compare delivered items with the final approved schedule before fitting if the size or colour appears wrong. Record the difference and ask for a written remedy rather than modifying the opening or accepting an informal discount immediately. Receive the revised decision and responsibility record; made-to-measure products still need to match what was agreed.
Planning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Compare delivered items with the final approved schedule before fitting if the size or colour appears wrong. Record the difference and ask for a written remedy rather than modifying the opening or accepting an informal discount immediately. Receive the revised decision and responsibility record; made-to-measure products still need to match what was agreed.
What you should receive
- The approved-versus-delivered comparison.
- The written remedy and responsibility decision.
- Any revised order and approval record.
Print this page to use the checklist on the day.
1. Check the correct revision
Use the final authorised drawings, colour sample references and item labels. Identify whether the delivery differs from the agreement or whether an order change was recorded. Do not rely on a superseded quotation or screen colour alone. Ask the supplier to explain any apparent discrepancy before work proceeds.
2. Pause adaptation and agree action
A wrong-sized frame should not be made to fit by an unplanned alteration to structure or excessive packing. Ask who accepted survey responsibility and what remedy is proposed. Keep photos and dimensions taken by the responsible professional. Any replacement or agreed change should document price and programme effects.
3. Retain the decision record
If temporary fitting is necessary for security, clarify in writing what remains disputed. Keep the revised schedule and approval rather than silently changing the original order. If no agreement is reached, obtain consumer advice before accepting a settlement or changing payment. Record the final product and finish at handover.
Warning signs
- The opening is altered without design.
- A colour change is accepted only verbally.
- The final drawing revision cannot be identified.
Relevant UK rules
Made-to-measure status does not remove the need to supply the agreed goods and service. Remedies depend on the actual contract and circumstances; structural adaptations also need appropriate assessment and approval.
Official information
The full survey and installation process
Related pages on this topic
Questions people also ask
What should I agree before the work starts?
Use the final authorised drawings, colour sample references and item labels. Identify whether the delivery differs from the agreement or whether an order change was recorded. Do not rely on a superseded quotation or screen colour alone. Ask the supplier to explain any apparent discrepancy before work proceeds.
What evidence should I keep?
The approved-versus-delivered comparison. The written remedy and responsibility decision. Any revised order and approval record.
What should make me stop and ask questions?
The opening is altered without design. A colour change is accepted only verbally. The final drawing revision cannot be identified.
Last reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy