Skip to content

Free guidance. No fees. No sales calls.

White sash windows and a natural timber casement in a British red-brick home

Guide

What should making good inside include after window fitting?

Free guidance. No fees. No sales calls.

Short answer

Internal making good should be defined before removal, including plaster, linings, decoration and what happens if damaged
revealsreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
are exposed. A trim is not the same as a repaired wall. Receive the agreed finish standard and any variation in writing, with a clear boundary between necessary repairs and optional redecoration.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Internal making good should be defined before removal, including plaster, linings, decoration and what happens if damaged
revealsreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
are exposed. A trim is not the same as a repaired wall. Receive the agreed finish standard and any variation in writing, with a clear boundary between necessary repairs and optional redecoration.

What you should receive

  • A written inside finish standard.
  • An exposed-
    revealreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
    repair and variation record.
  • The decoration and follow-up instructions.

Print this page to use the checklist on the day.

1. Define the promised finish

Ask whether the price includes patch plaster, replacement linings, a ready-to-decorate surface or final decoration. Photograph existing cracks and fragile finishes. The contractor should explain likely disturbance around the opening, especially where old frames are embedded in plaster. Avoid the vague phrase making good without a finish description.

2. Inspect exposed reveals

If removal exposes loose masonry, damp or badly bonded plaster, ask for a record before it is covered. Necessary substrate repairs and cosmetic decoration are different tasks. Agree any extra scope and cost through the contract’s variation process; do not accept trims as an automatic substitute for a sound repaired
revealreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
.
insulate, seal and trim
Simplified principle only: the exact system and building detail must be designed and checked for your project.

3. Check the completed surface

Review edges, lining alignment and the agreed finish in normal light. Allow the contractor to explain material drying and decoration instructions without accepting unfinished work as finished. Record outstanding repairs with photographs and a return arrangement. Keep the agreed scope so a snag can be judged against something specific.

Warning signs

  • Loose substrate is covered with trims.
  • Additional repairs are done without agreement.
  • Ready to decorate is never defined.

Relevant UK rules

The agreed service and finish are governed by the contract and consumer rights. If damage affects structural support, moisture control or fire details, those technical requirements also need assessment before cosmetic repairs conceal the issue.

Official information

The full survey and installation process

What happens if window reveals are damaged during removal?

Damaged
revealsreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
should be photographed and assessed before the new frame or trims conceal them. Distinguish necessary substrate repairs from the cosmetic making-good scope and agree any variation in writing. Receive the repair and finish record; loose masonry, damp or unsupported edges should not be treated as an ordinary decoration snag.

What you should receive

  • The exposed-damage record.
  • The agreed repair or variation.
  • The final
    revealreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
    and finish evidence.

Print this page to use the checklist on the day.

1. Record what is exposed

Ask the lead fitter to identify the opening and photograph the damage before covering it. Compare with the pre-work condition record. Some disturbance may have been anticipated, but hidden loose substrate or moisture needs assessment. Do not decide responsibility from a quick photograph alone where the cause is disputed.

2. Agree the appropriate repair

Separate structural or moisture concerns from patch plaster and decoration. Identify who carries out each repair and whether the price or programme changes under the contract. The frame needs a suitable substrate; using wider trims does not resolve a loose
revealreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
or defective joint behind them.

3. Check before finishing

Ask for evidence of completed repairs and the agreed finish standard. Record outstanding decoration or external work with an owner and follow-up arrangement. Keep photographs with the variation and handover record. If an unresolved defect is about to be concealed, raise it before the job moves to cosmetic completion.

Warning signs

  • Loose material is immediately covered.
  • Extra repairs have no agreed scope.
  • Damage is treated as cosmetic without assessment.

Relevant UK rules

The contract and consumer rights affect repair responsibility. Structural, moisture and protected-building issues may need separate technical or consent decisions before making good proceeds.

Official information

Survey and installation checklists

Related pages on this topic

Questions people also ask

What should I agree before the work starts?
Ask whether the price includes patch plaster, replacement linings, a ready-to-decorate surface or final decoration. Photograph existing cracks and fragile finishes. The contractor should explain likely disturbance around the opening, especially where old frames are embedded in plaster. Avoid the vague phrase making good without a finish description.
What evidence should I keep?
A written inside finish standard. An exposed-
revealreveal: A reveal is the exposed side, top or bottom surface of a wall opening around a window or door. Its depth affects how the frame sits within the wall and how the junction is insulated and finished. Internal and external reveals may need different sealing and making-good details. More on reveal
repair and variation record. The decoration and follow-up instructions.
What should make me stop and ask questions?
Loose substrate is covered with trims. Additional repairs are done without agreement. Ready to decorate is never defined.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Checked by the trade team

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page