
Guide
How should windows and doors be surveyed for a new build or self-build?
Free guidance. No fees. No sales calls.
Short answer
A new-build survey must coordinate the constructed openings with the latest design, structure and finished levels. Dimensions taken from an early plan are not enough where the building has changed. Ask who accepts survey responsibility and how glazing, airtightness and drainage details are checked before manufacture and again before delivery.
Planning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
A new-build survey must coordinate the constructed openings with the latest design, structure and finished levels. Dimensions taken from an early plan are not enough where the building has changed. Ask who accepts survey responsibility and how glazing, airtightness and drainage details are checked before manufacture and again before delivery.
What you should receive
- The coordinated drawing revision.
- The measured opening and readiness record.
- Named responsibility for design, order and completion evidence.
Print this page to use the checklist on the day.
1. Check the design revision
Compare the glazing schedule with current architectural and structural drawings. Record floor build-ups, frame positions and the intended thermal and moisture interfaces. If the opening is not built, the supplier must state what the provisional order relies on and who guarantees that the finished construction will match it.
2. Verify the constructed opening
Arrange measurement and readiness checks at the agreed hold point. Ask how masonry, timber-frame movement, support and bearing are assessed. Changes on site should reach the designer and glazing supplier together. Do not expect the installer to reconcile conflicting drawings with a wider bead of sealant.
3. Close the coordination loop
Keep the final measured schedule, designer-approved interfaces and inspection record together. Identify who supplies evidence for , energy assessment and completion. Plan delivery only when safe access and prepared openings are available. Ordering early should not mean losing a clear route for correcting design changes.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building controlWarning signs
- Early plans are treated as final site dimensions.
- Floor build-ups remain unknown.
- Builder and supplier drawings conflict.
Relevant UK rules
New dwellings follow their applicable energy, ventilation, safety and approval requirements as a whole building. Individual product figures are not a substitute for the project’s design assessment or the Scottish warrant and completion process.
Official information
The full survey and installation process
Related pages on this topic
Questions people also ask
What should I agree before the work starts?
Compare the glazing schedule with current architectural and structural drawings. Record floor build-ups, frame positions and the intended thermal and moisture interfaces. If the opening is not built, the supplier must state what the provisional order relies on and who guarantees that the finished construction will match it.
What evidence should I keep?
The coordinated drawing revision. The measured opening and readiness record. Named responsibility for design, order and completion evidence.
What should make me stop and ask questions?
Early plans are treated as final site dimensions. Floor build-ups remain unknown. Builder and supplier drawings conflict.
Last reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy
Checked by the trade team
Related
Ask a free question
Didn't find your answer? Ask the team. The team usually replies within one working day.