Short answer

Snagging should compare the completed work with your contract, approved drawings and demonstrated operation. Record each issue by opening reference, with photographs and a responsible contact. Agree the next action rather than relying on a verbal promise; a snag list should distinguish a minor finish issue from a safety or weather problem.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
Snagging should compare the completed work with your contract, approved drawings and demonstrated operation. Record each issue by opening reference, with photographs and a responsible contact. Agree the next action rather than relying on a verbal promise; a snag list should distinguish a minor finish issue from a safety or weather problem.

What you should receive

  • An opening-by-opening snag record.
  • Photographs and operation demonstration notes.
  • Written remedies and follow-up responsibilities.

Print this page to use the checklist on the day.

1. Prepare the reference documents

Have the opening schedule and written making-good scope available for the walk-round. Ask the fitter to demonstrate each opening before judging its operation. Check appearance without entering unsafe areas or dismantling parts. For inaccessible exterior work, request the contractor’s inspection evidence or appropriate professional help.

2. Record the specific issue

Describe where the problem is, what happens and how it differs from the agreement. Separate delivery damage, unfinished work and a suspected defect. If an opening is unsafe or cannot secure, raise it immediately. Avoid diagnosing the cause from appearance alone or forcing stiff hardware to prove the problem.
even gaps
Simplified principle only: the exact system and building detail must be designed and checked for your project.

3. Agree the resolution

Ask for an owner, proposed remedy and follow-up arrangement for each item. Keep the list and responses with the contract. Payment and dispute decisions depend on the agreed terms and consumer rights; do not assume a snag automatically authorises withholding any amount. Seek advice if the contractor disputes responsibility.

Warning signs

  • You are told snags can only be verbal.
  • Unsafe operation is dismissed as cosmetic.
  • No person is responsible for returning.

Relevant UK rules

Consumer rights and the contract set the service and remedy framework. Technical faults affecting safety, weather protection or approval need appropriate assessment, not merely a cosmetic entry on a snag sheet.

Official information

The full survey and installation process

Related pages on this topic

Questions people also ask

What should I agree before the work starts?
Have the opening schedule and written making-good scope available for the walk-round. Ask the fitter to demonstrate each opening before judging its operation. Check appearance without entering unsafe areas or dismantling parts. For inaccessible exterior work, request the contractor’s inspection evidence or appropriate professional help.
What evidence should I keep?
An opening-by-opening snag record. Photographs and operation demonstration notes. Written remedies and follow-up responsibilities.
What should make me stop and ask questions?
You are told snags can only be verbal. Unsafe operation is dismissed as cosmetic. No person is responsible for returning.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Checked by the trade team

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page