What should you check about Approved Document Q for new homes in England?
Short answer
Approved Document Q gives guidance on security for new dwellings, including relevant doors and accessible windows. It is not a blanket certification of every product from a brand. Ask the designer to identify the covered openings and obtain evidence for the exact frame, glass and hardware configuration, then keep that specification intact through manufacture and installation.
Planning this? Get a free, no-obligation installer recommendation
This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
1. Confirm scope for the project
Ask which requirements and document edition apply to the new dwelling. Identify the doors and accessible windows covered by the guidance on the opening schedule. Do not present a replacement-window sales claim as proof of a new-home compliance design.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building control2. Obtain assembly evidence
Security depends on the tested or assessed doorset or window configuration, including hardware and glazing. A lock label alone does not prove the complete assembly meets the design requirements. Ask the supplier to relate its evidence to the proposed sizes, opening types and options.
3. Protect the specification on site
Record fixings and installation responsibilities alongside the security schedule. A substitution in glass, handles or locking arrangements needs review. Keep product evidence and handover records available for , and check that occupants can use security features without conflicting with escape needs.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building controlBefore you order
- Covered openings identified
- Current requirements confirmed
- Exact assembly evidence obtained
- Hardware substitutions reviewed
Print this page to use the checklist on the day.
Official sources — last checked 2026-11-24
Questions people also ask
Is a lock alone sufficient evidence?
No. Ask for evidence covering the relevant complete assembly and configuration.
Does a brand’s security claim cover every option?
Do not assume so. Check the specific product and ordered options.
Does this guide cover all replacement projects?
It focuses on new-home security guidance. Ask what applies to other work.
building control
building control: Building control is the process of checking relevant building work against applicable building regulations. It is separate from planning permission. The route and required paperwork depend on the work and where the building is located; Scotland uses a building standards system with warrants where required and completion procedures through the verifier. More on building controlLast reviewed:
Answered by the Windows & Doors Answered team. How we write answers · Corrections policy