Short answer

Treat new-build glazing as a coordinated package, not a late frame purchase. Develop the opening schedule with the energy, structure, ventilation and overheating design, then agree wall interfaces and responsibilities. Tender the same requirements to suppliers and control substitutions. Confirm final dimensions, floor levels and evidence before manufacture, and retain installation and completion records.

Planning this? Get a free, no-obligation installer recommendation

This is general information, not planning, building-regulations or legal advice. Rules depend on the property, the work and the nation you live in. Confirm your own project with your local council or building control body before ordering.
The self-build-quote answer lists what to send; this guide follows design, tender, manufacture and completion. A change of glass area, opening action or product performance can affect calculations and detailing elsewhere in the home. Keep the glazing supplier, designer, energy assessor and main contractor working from the same revision rather than separate sets of assumptions.

1. Develop the design and performance brief

Number openings on plans and elevations and record action, handing, glass and room function. Coordinate daylight, privacy, escape and ventilation with the building design. Ask the energy assessor to state the required whole-product performance and relevant glass properties. Check summer overheating requirements as well as winter heat loss. Confirm the applicable England or Scottish approval process and standards edition.

2. Resolve wall interfaces and responsibility

Agree frame position, support, movement, cavity closures, membranes,
cillscill: A cill is the lower projecting section beneath a window or door frame that helps shed rainwater away from the wall. It is also spelt sill. Its projection, joints and connection to the frame need to suit the wall construction, so water does not collect or run into vulnerable junctions. More on cill
and
thresholdsthreshold: A threshold is the bottom part of a door set that you cross when entering or leaving. It connects the door seals, drainage and floor levels. A low or visually flush threshold can make movement easier, but it still needs an appropriate weather detail and a properly planned external water route. More on threshold
on sections. Timber-frame and masonry details are not interchangeable. Allocate design, supply and fitting for each interface and state who verifies structural openings before manufacture. Plan glass delivery, lifting, storage and weather protection so the build programme includes what is required before the glazing arrives.

Before moving on

  • The opening schedule matches the energy model
  • Wall interfaces have named responsibilities
  • Tender alternatives are clearly identified

Print this page to use the checklist on the day.

3. Tender and assess alternatives

Issue the same schedule, drawings and performance brief to bidders. Ask for deviations, provisional items and installation exclusions as separate returns. Compare whole-package cost and serviceability alongside materials. Any alternative frame or glass should be reviewed by the designer and energy assessor before approval; a lower price does not establish equivalence to the calculated or approved specification.

4. Control manufacture and completion

Confirm built dimensions and levels through the agreed survey process, then approve one coordinated drawing revision. Record programme dependencies and payment milestones. During fitting, retain required evidence of hidden interfaces and installed products. Check operation and snagging at handover and supply the completion team with the relevant product, calculation and installation records rather than a generic brochure.

Your project checklist

  • Confirm standards and approval route
  • Resolve overheating and ventilation
  • Coordinate structural tolerances
  • Verify built openings
  • Review substitutions before order
  • Retain completion evidence

Print this page to use the checklist on the day.

What to do next

Bring the designer, energy assessor, builder and glazing supplier together around one schedule and interface drawing set. Resolve responsibilities before tendering. Review the returned deviations and final survey findings, then authorise manufacture only after the design and calculations agree.

Relevant answers and comparisons

Useful tools

Official information

Questions people also ask

Can I order from planning drawings?
Use them for an early budget, not an unchecked manufacturing order. Final actions, performance, wall details and dimensions need confirmation.
Does a material label prove energy compliance?
No. The configured whole-product figures and the whole-building calculation must match the installed design.
Should I order before the structure is built?
Only under a clear arrangement for dimensions and responsibility. Agree when openings are verified and what happens if the built sizes differ.

Last reviewed:

Answered by the Windows & Doors Answered team. How we write answers · Corrections policy

Ask a free question

Didn't find your answer? Ask the team. The team usually replies within one working day.

Free guidance. No fees. No sales calls.

We use your question only to write back with an answer. Privacy policy.

Ask a follow-up about this page